January 11th, 2010

Hanging Drywall

Drywall started going up today. When I stopped by, they were done with the top floor and most of the main floor. I assume that they’ll finish the basement tomorrow. So far its looking pretty good, as soon as the guys are done hanging it, someone will come in and taping, mud, texture. Our contractor expects the process to take about two weeks.

Siding

Siding continues while the drywall is happening. Hopefully soon we’ll get the steel frame up so that our volume can be completed. Right now we’re waiting on a little more paperwork from our engineer to get that going.