December 21st, 2010

Second Blower Door Test

This morning we had our second blower door test done… Its not normal to have to get a second test done, but our house doesn’t fit very neatly into the LEED so after being granted a series of appeals, we are getting new performance tests. Read the rest of this entry »

September 26th, 2009

Panels Complete

Yesterday the last of our panels were installed.  So now with the exception of the screening around our roof garden, we have a complete volume.  And with the exception of our doors and windows, we have a complete envelope. Read the rest of this entry »

September 18th, 2009

The Beginnings of a Second Floor

Another busy day today.  Our second floor began to go up and I wandered around in the future bedroom and roof garden a little this afternoon.  There has been a lot of progress in the three full days of panel installation, and now we have a little time off.  Not just the weekend, but our framers have to go to a different job site for a couple of days and won’t be back until Wednesday.  At this rate though, the three days of work next week might be enough to finish the framing.

Read the rest of this entry »

September 16th, 2009

Panel Installation Day Two

Productive day, we met with our engineer this morning and figured out a few details, and almost all of the first floor panels went up.

Read the rest of this entry »

September 15th, 2009

Panels!

Over the course of a rather nutty morning, our panels arrived and were unloaded…  One day late.

Read the rest of this entry »